The Sample Project

Add a New Vertically Bored GHEX

Now that you have defined a zone we need to add the specifications for our ground heat exchanger. For this project we will be using a vertically bored GHEX but once we are GHEX drop down listdone, you can go back and experiment with adding horizontally bored or horizontally trenched options to the design.

Click theNew GHEX iconbutton in your tool tray.

 

In the future, if you click on the GHEX button by mistake, you can hide the dropdown list by clicking anywhere else on the page.

 

Vertically Bored GHEX

Name: Vertical Bore 1
Average Formation Thermal Conductivity: 1.30 Btu/hr ft °F
Bore Diameter: 5.00 in
Bore Spacing: 20 ft
Layout Rows: 1x
Number of Bores in Series (NBIS): 1
Bores Per Row: 3
Grout Thermal Conductivity: 0.57Btu/hr ft °F
Pipe Diameter (DP): 3/4 in

save button

 

Buttons on this Page

 

table icon

Opens Thermal Property Ranges of Selected Soils & Rocks table in a new browser window.

GHEX Summary

The GHEX summary gives you an overview of the details for the GHEX design. The dominant mode will be signified by a grey header.

 

GHEX Summary